CHART 18

DEFENSE PROGRAMS

NUCLEAR MATERIALS

SECURITY PROJECTS

FY 1985 REQUEST OF $35.8M CONTINUES CONSTRUCTION OF
SECURITY PROTECTIVE SYSTEMS & FACILITIES AT RL, SR, & ID

RL PROJECTS 85-D-136 (TEC $3.3M), COMPONENTS PROTECTION
SYSTEM AT N RX & 85-D-137 (TEC $4.4M), VAULT SAFETY SPECIAL
NUCLEAR MATERIAL INVENTORY SYSTEM

$5.8M FUNDING

[Deleted]

SR PROJECTS 84-D-134 (TEC $47.8M), PLANT WIDE SAFEGUARDS &
SECURITY IMPROVEMENTS & 82-D-127 (TEC $34.6M) SAFEGUARDS
IMPROVEMENTS

$21.6M FUNDING

[Deleted]

ID PROJECTS 84-D-137 (TEC $10M), FACILITY SECURITY SYSTEMS UPGRADE AND 82-D-128 (TEC $5.4M) PLANT PERIMETER SECURITY SYSTEMS UPGRADE

$8.4M FUNDING

[Deleted]

CHART 19

NUCLEAR MATERIALS PRODUCTION

FY 1985 BUDGET REQUEST

ENVIRONMENTAL PROTECTION UPGRADES AT SR (FY 84 & FY 85)

• GROUNDWATER CONTAMINATION INVESTIGATION INCLUDING MONITORING WELLS

• FUEL FABRICATION AREA

[ocr errors]

DECONTAMINATION OF GROUNDWATER
EFFLUENT TREATMENT FACILITIES

- DECOMMISSIONING OF SEEPAGE BASIN

[blocks in formation]

CHART 20

NUCLEAR MATERIALS PRODUCTION
FY 1985 BUDGET REQUEST

FACILITY RESTORATION PROGRAM

• PROGRAM OBJECTIVE IS TO CORRECT ACCUMULATED DEFICIENCIES TO RESTORE THE OPERATING CAPABILITIES OF THE PRODUCTION COMPLEX

• TOTAL PROGRAM COST, EXCLUDING IDAHO, IS $462 MILLION FUNDED OVER 6 YEARS

• FY 1985 FUNDING REQUEST IS $84.5 MILLION AUTHORIZATION AND APPROPRIATION

[blocks in formation]

• THROUGH FY 1984 CONGRESS HAS AUTHORIZED AND APPROPRIATED $315 MILLION FOR THIS PROGRAM

CHART 21

IDAHO FUEL PROCESSING

RESTORATION

(PROJECT 85-D-139)

• REQUIRED BY 1992 TO PROCESS PLANNED RECEIPTS OF NAVAL REACTORS SPENT FUEL

• RECOVERED HIGHLY ENRICHED URANIUM PROVIDES PRINCIPAL SOURCE OF FUEL FOR SR REACTORS

• PROVIDES THE MOST COST-EFFECTIVE ALTERNATIVE FOR
MEETING NAVAL FUEL RECEIPT REQUIREMENTS AND
FUELING SR REACTORS BASED ON CURRENT
COST/BENEFIT ANALYSES

• RESTORES AGING PILOT PLANT BUILT IN 1951 TO DEMONSTRATE NAVY FUEL PROCESSING CAPABILITY

• PRELIMINARY PROJECT TEC $230M FY 1985 REQUEST $10M FOR DESIGN

CHART 22

SR FUEL IMPROVEMENT PROGRAM

• U-236 BUILDUP IN SRP REACTOR FUEL REDUCES PRODUCTION EFFICIENCY

• PSP TECHNOLOGY PROVIDES COST-EFFECTIVE MEANS FOR REMOVING U-236, RESTORING PRODUCTIVITY, AND REDUCING REQUIREMENTS FOR NEW HIGHLY ENRICHED URANIUM

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

FY 1985 FUNDING PROVIDES FOR PURCHASE OF SEU FROM GASEOUS DIFFUSION PLANTS, COMPLETION OF FACILITY STORAGE MODIFICATIONS, AND INITIATION OF PRODUCTION OF MARK-15 CORES AT OR AND SR

PARTIAL CONVERSION OF SR REACTORS PLANNED FOR FY 1986

CHART 24

SPECIAL ISOTOPE SEPARATION
PROGRAM SUMMARY

• AVLIS PROCESS SELECTED FOR PRODUCTION PROTOTYPE - FY 1983

[blocks in formation]

• PRODUCTION PROTOTYPE OPERATION FY 1989 (ONE YEAR DELAY)

[blocks in formation]

• REQUIRED FOR PROCESSING DOE-OWNED PU-BEARING FUELS, E.G., FFTF (FFTF FUEL CONTAINS OVER 3 MT OF DEFENSE PROGRAMS ORIGIN FUEL GRADE PU VALUED AT MORE THAN $1.2 BILLION)

• FACILITY DESIGN AND EQUIPMENT ENGINEERING INITIATED FY 1984

• NO ADDITIONAL FUNDING REQUESTED IN FY 1985.
PROJECT COMPLETION BEING DELAYED 1 YEAR
CONSISTENT WITH SIS DELAY. PFM RECOVERED PU
COULD BE UTILIZED FOR BLENDING IN THE LONG TERM
WITHOUT SIS.

• TEC $155 MILLION

REACTOR SAFETY

CHART 26

• FY 1985 BUDGET INCLUDES $14.4 MILLION OPERATING AND $11.3 MILLION CONSTRUCTION

• OPERATING FUNDING PROVIDES:

REACTOR OPERATOR TRAINING AT SR AND RL

REACTOR SIMULATOR DEVELOPMENT AT RL

MODIFICATIONS TO SR AND RL REACTORS TO REDUCE THE RISK
OF ACCIDENTS

• PROJECT 82-D-126, REACTOR SAFETY AND RELIABILITY, TEC $40.6 MILLION

RL $5.5 MILLION FOR EMERGENCY SHUTDOWN PANEL AND CONTROL
ROOM ISOLATION

- SR

$5.8 MILLION FOR COMPLETING REACTOR SIMULATOR TRAINING FACILITY AND REMOTE DETECTION AND CONTROL CAPABILITY

CHART 27

NUCLEAR MATERIALS PRODUCTION

FY 1985 BUDGET REQUEST

NEW CONSTRUCTION PROJECTS

(DOLLARS IN MILLIONS)

[blocks in formation]