[merged small][merged small][ocr errors][subsumed][subsumed][merged small][ocr errors][subsumed][subsumed][merged small][graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][ocr errors][subsumed][ocr errors][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][ocr errors][ocr errors][ocr errors][merged small]

CHART 9
NUCLEAR MATERIALS PRODUCTION
FY 1984 SUPPLEMENTAL REQUEST
(DOLLARS IN MILLIONS)

TEC REQUEST ! i
WEAPONS SUPPORT
OPERATING EXPENSES, OR

$ 0.5
84-D-136 ENRICHED URANIUM CONVERSION
FACILITY, OR

$ 20.6

[ocr errors]
[merged small][ocr errors][merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][ocr errors]

CHART 10
NUCLEAR MATERIALS PRODUCTION
FY 1984 SUPPLEMENTAL REQUEST

WEAPONS SUPPORT

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[ocr errors]

82-D-127 SAFEGUARDS IMPROVEMENTS, SR
• TEC $34.6 MILLION; FY 84 APPROP. $7.0 MILLION

(Deleted]

12.0

84-D-134 SAFEGUARDS AND SECURITY
IMPROVEMENTS PLANTWIDE, SR
• TEC $47.8 MILLION; FY 84 APPROP. $0

[Deleted]

2.0

84-D-137 FACILITY SECURITY SYSTEMS
UPGRADE, ID
• TEC $10.0 MILLION; FY 84 APPROP. SO
• INITIATE DESIGN AND PROCUREMENT
ACTIVITIES

(Deleted]

CHART 12
NUCLEAR MATERIALS PRODUCTION
FY 1984 SUPPLEMENTAL REQUEST

ENVIRONMENTAL

APPROP.

$30.0

OPERATING EXPENSES, SR
• FUEL FABRICATION AREA SEEPAGE BASIC PHASE-OUT
DEMONSTRATION PROJECT ($15.0 MILLION)
- REMOVE HAZARDOUS CONSTITUENTS FROM WASTE

STREAM
- ALLOW DISCHARGE TO SURFACE WATERS IN ACCORD

WITH NPDES • GROUNDWATER CONTROL ACTIVITIES ($15.0 MILLION) - NOT IN FULL COMPLIANCE WITH CLEAN WATER ACT

SOME GROUNDWATER CONTAMINATED - DECONTAMINATE GROUNDWATER IN M-AREA

GROUNDWATER CONTAMINATION INVESTIGATION

83-D-147 POLLUTION DISCHARGE ELIMINATION

• TEC $9.65 MILLION; FY 84 APPROP. $2.0 MILLION
• CONTROL LIQUID EFFLUENTS
• ADVANCES COMPLETION 9 MONTHS

83-D-148 NONRADIOACTIVE HAZARDOUS WASTE MANAGEMENT

• TEC $22.1 MILLION; FY 84 APPROP. $3.0 MILLION • TREAT AND DISPOSE OF HAZARDOUS WASTES • ADVANCES COMPLETION BY 6 MONTHS

[merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][ocr errors][merged small][ocr errors][merged small][merged small]

CHART 14

NUCLEAR MATERIALS PRODUCTION

FY 1985 BUDGET REQUEST

BASE ACTIVITIES • OPERATE THREE SAVANNAH RIVER REACTORS TO PRODUCE 3 PERCENT

PU-240 PLUTONIUM AND TRITIUM • OPERATE L REACTOR AT SAVANNAH RIVER • OPERATE RICHLAND N REACTOR TO PRODUCE WEAPON-GRADE PLUTONIUM

AND BY-PRODUCT STEAM • OPERATE TWO PROCESSING CANYONS AT SAVANNAH RIVER TO RECOVER

PLUTONIUM AND TRITIUM • OPERATE PUREX PROCESSING PLANT AT RICHLAND • OPERATE IDAHO CHEMICAL PROCESSING PLANT TO PROCESS NAVY, R&D,

AND OTHER SPENT FUELS • OPERATE FEED PRODUCTION PLANTS AT FERNALD AND ASHTABULA,

OHIO, AND OAK RIDGE, TENNESSEE • CONTINUE ACTIVITIES TO SUPPORT THE PRODUCTION AND PROCESSING

OF NUCLEAR MATERIALS • CONTINUE PRIOR YEAR CONSTRUCTION PROJECTS • BEGIN TWO NEW CONSTRUCTION PROJECTS TO PROVIDE A MORE EFFICIENT

PROCESS TO PRODUCE REACTOR FUEL TUBES AT SR AND TO CENTRALIZE URANYL NITRATE CONVERSION OPERATIONS

(Deleted)

CHART 15 NEW PRODUCTION REACTOR (NPR)

• NPR WOULD PROVIDE ASSURED SUPPLY OF

TRITIUM VITAL TO MAINTAINING NUCLEAR WEAPONS
STOCKPILE

NPR STUDIES UNDERWAY TO SUPPORT REACTOR
CONCEPT/SITE SELECTION BY MID FY 1985 FOR
RECOMMENDATION TO PRESIDENT

CHART 16

DEFENSE PROGRAMS-NUCLEAR MATERIALS

NEW PRODUCTION REACTOR

• COST ESTIMATES

- CONDUCT PRE-CONCEPTUAL DESIGN STUDIES
- DEVELOP ASSOCIATED CONCEPT & SUPPORT FACIL. COSTS
- DETERMINE LIFECYCLE & PRODUCT UNIT COSTS

- PROVIDE PROJECT/MANAGEMENT PLANS • SYSTEMS ENGINEERING - DEFINE FUNCTIONAL & OPERATIONAL CHARACTERISTICS OF SUPPORT

FACILITIES
- SUPPORT CRITICAL REACTOR TECHNOLOGY R&D
• SAFETY STUDIES

- DEVELOP SOURCE TERMS
- EVALUATE CONCEPTS & SUPPORT FACILITIES
- EVALUATE COMPONENT OPERABILITY & AVAILABILITY

- DEFINE SAFETY MARGINS & DEVELOP MODELS
• ENVIRONMENTAL STUDIES
- GATHER ENVIRONMENTAL DATA TO SUPPORT FUTURE NEPA

DOCUMENTATION - PLACE ENVIRONMENTAL STUDIES CONTRACT WITH OPTION FOR EIS

PREPARATION • PREPARATION OF ENVIRONMENTAL REPORT

CHART 17

L REACTOR UPGRADE

• L REACTOR WAS UPGRADED TO EQUIVALENT STATUS OF

THREE OPERATING REACTORS AT SR • REACTOR UPGRADE COMPLETED ON SCHEDULE OCTOBER

1983

• REACTOR UPGRADE COSTS WERE $190 MILLION

• CURRENT STATUS
- PUBLIC LAW 48-50 AND COURT ORDER REQUIRES COMPLETION OF

EIS BEFORE RESTART
- PUBLIC LAW 98-50 REQUIRES OBTAINING NPDES PERMIT BEFORE

RESTART - DRAFT EIS ISSUED 9/83 - FINAL EIS SCHEDULED 4/84 - NPDES PERMIT BEING NEGOTIATED WITH SOUTH CAROLINA