FUEL AND BLANKET DESIGN DOCUMENTS COMPLETE AND UP-TO-DATE

VERY AGGRESSIVE CDE LEAD TEST IN FFTF CURRENTLY AT 75% OF CDE EXPOSURE; OUT EOC8 FOR PIN TRANSIENT TESTS AT BURNUP OF 130 MWd/kgM

HT9 DUCTS IN FFTF PERFORM EXTREMELY WELL NO GROWTH AND LOW WITHDRAWAL LOADS

RBCB TESTS OF HT9 CLADDING TO START SOON IN EBR-II

NEW HT9 MATERIALS DATA CONTINUE TO SUPPORT CDE APPLICATION

FABRICATION ON SCHEDULE; 10 FUEL ASSEMBLIES AND 6 BLANKET ASSEMBLIES TO BE COMPLETED IN MARCH, 1986 (APPROX.

300 kg/yr MOX)

HEDL 8801-165.16

[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][ocr errors][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][merged small]
[blocks in formation]

HEDL.

ATTACHMENT 5

FUELS AND MATERIALS
EXAMINATION FACILITY

FMEF

MISSION

• Provide Fuel for FFTF and for Special Tests to be
Conducted in FFTF

• Provide State-of-the-Art Safeguards and Security for
Storage and Use of Special Nuclear Materials (SNM)
at HEDL

• Perform Fuel Supply Missions for Other Plants as
Required by DOE

ADDITIONAL CAPABILITIES

• Category Nuclear Facility, Only One of its kind in
the U.S.

Extensive Shielded Facilities with a variety of Potential
Applications:

• Reprocessing Technology Development

• Integral Reprocessing and Refabrication of Alternate
Fuels

• Isotope Separation

• Decontamination and Repair of Equipment

SCHEDULE/STATUS

• Construction Completed August, 1984

• Systems Startup and Testing 80% Complete
Fabrication (SAF Line) Equipment Installation
90% Complete

• Plutonium Storage Readiness September, 1986

Fuel Assembly Fabrication/Storage Readiness April, 1988
Plutonium Fuel Fabrication Readiness August, 1988

[graphic]