| 2000 - 928 pages
...available technology for repository construction, operation, and closure. (d) Disqualifying condition. A site shall be disqualified if, based on expected...for repository construction, operation, or closure. §960.5-2-11 Tectonics. (a) Qualifying Conditions. The site shall be located in a geologic setting... | |
| 2002 - 996 pages
...available technology for repository construction, operation, and closure. (d) Disqualifying condition. A site shall be disqualified if, based on expected...for repository construction, operation, or closure. §960.5-2-11 Tectonics. (a) Qualifying Conditions. The site shall be located in a geologic setting... | |
| 1999 - 900 pages
...be disqualified if, based on the expected nature and rates of fault movement or other ground motion, it is likely that engineering measures that are beyond...for repository construction, operation, or closure. APPENDIX I TO PART 960— NRC AND EPA REQUIREMENTS FOR POSTCLOSURE REPOSITORY PERFORMANCE Under proposed... | |
| 1987 - 910 pages
...based on the expected nature and rates of fault movement or other ground motion, it Pt. 960, App. II is likely that engineering measures that are beyond...for repository construction, operation, or closure. APPENDIX I— NRC AND EPA REQUIREMENTS FOR POSTCLOSURE REPOSITORY PERFORMANCE Under proposed 40 CFR... | |
| 1989 - 1068 pages
...be disqualified If, based on the expected nature and rates of fault movement or other ground motion, It Is likely that engineering measures that are beyond...required for exploratory-shaft construction or for repodtory construction, operation, or closure. APPENDIX I—NRC 4 MENTS FOR Pt TORY I Under prooosed... | |
| 2000 - 928 pages
...be disqualified if, based on the expected nature and rates of fault movement or other ground motion, it is likely that engineering measures that are beyond...reasonably available technology will be required for exploratory10 CFR Ch. Ill (1-1-00 Edition) shaft construction or for repository construction, operation,... | |
| United States. Congress. Senate. Committee on Energy and Natural Resources - 1987 - 688 pages
...evidence does not support a finding that the site Is disqualified. 960.5-2-lO(d) Oisqualifying Condition; A site shall be disqualified if, based on expected...construction or for repository construction, operation or closures. Assessment Results: Required engineering measures to be utilized In the construction of the... | |
| United States. Congress. Senate. Committee on Energy and Natural Resources - 1987 - 644 pages
...be disqualified if, based on the expected nature and rates of fault movement or other ground motion, it is likely that engineering measures that are beyond...for repository construction, operation, or closure. DOE finds that the site is not disqualified because reasonably available technology is expected to... | |
| United States. Congress. Senate. Committee on Energy and Natural Resources - 1990 - 336 pages
...technology for repository construction, operation, and closure. (d) Disqualifying Condition. A lite shall be disqualified If, based on expected ground-water...for repository construction, operation, or closure. •SMS-zl) Tectonics. (a) Qualifying Conditions. The site shail be located In a geologic setting In... | |
| |