" ... completed or are underway to ensure an efficient transition to near-term site activities. Chief among these is the Department's selection of the Universities Research Association (URA) to build, manage, and operate the SSC laboratory. A contract was... "
Fiscal Year 1990 Department of Energy Authorization: Hearing Before the ... - Page 33
de United States. Congress. House. Committee on Science, Space, and Technology. Subcommittee on Energy Research and Development - 1989
Affichage du livre entier - À propos de ce livre

Energy and water development appropriations for 1990: hearings ..., Partie 5

United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development - 1989 - 1324 pages
...January 18, 1989. Site geotechnical studies and gathering of facts for the Supplemental Envirommontal Impact Statement will begin shortly. A revised conceptual...reviewed and validated by the Department early in 1950. It is also planned that URA will select on a competitive basis an architect engineer/construction...
Affichage du livre entier - À propos de ce livre

Energy and Water Development Appropriations for Fiscal Year 1990: Department ...

United States. Congress. Senate. Committee on Appropriations. Subcommittee on Energy and Water Development - 1989 - 372 pages
...operate the SSC laboratory. A contract was signed on January 18, 1989. Site geotechnical studies and gathering of facts for the Supplemental Environmental...results of R&D since 1986 will be completed in the Fall 234 of 1989. This revised conceptual design, which will include a new bottoms-up cost estimate and...
Affichage du livre entier - À propos de ce livre

Proposed Fiscal Year 1990 Budget Request (DOE's Office of Energy ..., Volume 4

United States. Congress. Senate. Committee on Energy and Natural Resources. Subcommittee on Energy Research and Development - 1989 - 384 pages
...(URA) to build, manage, and operate the SSC laboratory. A contract was signed on January 18, 1g8g. Site geotechnical studies and 12 gathering of facts...characteristics of the Texas site and the results of R&D since 1g86 will be completed in the fall of 1g8g. This revised conceptual design, which will Include a new...
Affichage du livre entier - À propos de ce livre

Energy and Water Development Appropriations for Fiscal Year 1990: Department ...

United States. Congress. Senate. Committee on Appropriations. Subcommittee on Energy and Water Development - 1989 - 406 pages
...operate the SSC laboratory. A contract was signed on January 18, 1g8g. Site geotechnlcal studies and gathering of facts for the Supplemental Environmental...characteristics of the Texas site and the results of R&D since 1g86 will be completed in the Fall 234 of 1g8g. This revised conceptual design, which will include...
Affichage du livre entier - À propos de ce livre

Energy and Water Development Appropriations for 1990: Hearings ..., Partie 5

United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development - 1989 - 1316 pages
...operate the SSC laboratory. A contract was signed on January 18, 1989. Site geotechnical studies and gathering of facts for the Supplemental Environmental...characteristics of the Texas site and the results of R&O since 1986 will be completed in the fall of 1989. This revised conceptual design, which will Include...
Affichage du livre entier - À propos de ce livre